Engineering Resume Keywords

Weave the highlighted engineering resume keywords adding common synonyms to augment these keywords. Consider hard skills, areas of expertise, personal information, awards, soft skills, references, general information, and academic qualifications as engineering resume keywords.

The 45 best Engineering Resume Keywords

>

Analyzed
Example: Analyzed department’s future IT needs and drafted plan to ensure strategic alignment with overall business plan.

Certified
Example: Certified weights and balances of precision equipment.

Conceptualized
Example: Conceptualized and developed scripts to support infrastructure security—scripts were subsequently used as models for current monitoring tools.

Connected
Example: Connected satellite users with main office through networking devices.

Created
Example: Created reference materials, quickly bringing technicians and system operators to high levels of competency.

Decoded
Example: Decoded encrypted data.

Designed
Example: Designed software solutions for widget-processing industry.

Detected
Example: Detected faulty components.

Equipped
Example: Equipped district with videoconferencing capabilities.

Evaluated
Example: Evaluated system failures and pinpointed errors.

Expanded
Example: Expanded system capabilities.

Fabricated
Example: Fabricated components per customer specifications.

Facilitated
Example: Facilitated complex migration to updated operating system.

Fixed
Example: Fixed recurring problems that had eluded prior technicians.

Gauged
Example: Gauged user needs and system capabilities and recommended appropriate hardware upgrade.

Grasped
Example: Grasped quickly concepts and procedures for new operating system and selected from staff of 12 to train other technologists (training is normally outsourced).

Honed
Example: Honed troubleshooting skills through advanced IBM component-level troubleshooting course.

Identified
Example: Identified user needs and modified system accordingly.

Installed
Example: Installed new system, providing users with uninterrupted service during project.

Integrated
Example: Integrated accounting functions with sales, warehousing, and shipping.

Investigated
Example: Investigated recurring computer crashes; traced glitch to vendor software and served as liaison in problem resolution.

Isolated
Example: Isolated technical malfunctions at the component level.

Mastered
Example: Mastered intricacies of new software and was called on as resident expert to explain advanced functions.

Planned
Example: Planned move of mission-critical business systems to alternative computing platform, including all international business support, publications, regulatory, and distribution systems.

Preserved
Example: Preserved integrity of data.

Prevented
Example: Prevented system failures that had plagued previous system administrators.

Programmed
Example: Programmed in ASP.net, XML, C#.net, CSS, IIS, SQL Server, and Oracle PL/SQL.

Reconstructed
Example: Reconstructed corrupted data using various software tools.

Reengineered
Example: Reengineered data-management foundation on IBM mainframe platform from VSAM flat-file environment to SQL-based DB.

Relied
Example: Relied on crack technical team to program and test new software release.

Repaired
Example: Repaired and maintained 200-user network.

Restored
Example: Restored 100 percent of data after earthquake disaster.

Retrieved
Example: Retrieved and manipulated data.

Revolutionized
Example: Revolutionized use of software, engineering an innovative data-acquisition and analysis platform to gather and analyze flight-test data for experimental aircraft.

Safeguarded
Example: Safeguarded data through disaster-recovery protocol.

Salvaged
Example: Salvaged mismanaged IT conversion (a $300,000 capital investment)—directed installation project for world-class computer system to support 24-hour, seven-day operation.

Searched
Example: Searched Internet using a variety of sophisticated search commands.

Showed
Example: Showed nontechnical staff how to conduct advanced Boolean searches.

Systematized
Example: Systematized protocols to improve procedure-execution accuracy from 85 percent to 99 percent.

Tested
Example: Tested new Windows-based release of software.

Trained
Example: Trained users, converting computer-phobics to technically competent operators.

Troubleshot
Example: Troubleshot puzzling hardware problems at board and component levels.

Turned
Example: Turned technicians into business professionals who understand multidimensional corporate needs and bottom-line profit.

Upgraded
Example: Upgraded hardware and software, implementing five major software upgrades over tenure.

Wrote
Example: Wrote and installed aliases that reduced input errors 50 percent and increased efficiency of routines 30 percent.